beautypg.com

Brookfield DV-III Rheometer User Manual

Page 7

background image

Brookfield Engineering Laboratories, Inc.

Page 7

Manual No. M/98-211-A0701

2) Insert the mounting handle on the back of the DV-III+ into the hole on the clamp assembly

(Figure 2).

Figure 2

3) Tighten the DV-III+ clamp Screw (Figure 2).

Note:

If the clamp assembly moves along the upright rod too freely, tighten the
tension screw (see Appendix F).

4) Insert the ribbon cable into the DV-III+ Rheometer head. Insert the other end of the ribbon

cable into the connector on the DV-III+ base (see Figure 3).

Bubble Level

Rack Gear

Clamp Screw

Clamp Assembly

Upright Rod

Mounting Handle