beautypg.com

I.5 set-up, Set-up – Brookfield DV-III Rheometer User Manual

Page 6

background image

Brookfield Engineering Laboratories, Inc.

Page 6

Manual No. M/98-211-A0701

I.5 Set-Up

1) Place the upright rod into the hole at the front of the base. The rack gear and clamp assembly

should face the rear of the base (see Figure 1). The upright rod is held in place with the jam nut
which is attached from the bottom of the base. Tighten this nut with a suitable wrench (spanner).

Figure 1

BASE UNIT

VS-41Y
CLAMP KNOB
ASSEMBLY

50S044012E140
4-40 x 3/8 LG.
SOC. HD. CAP SCREW

VS-35
UNIVERSAL
CLAMP

VS-40Y
GEAR SCREW
ASSEMBLY

VS-29
TENSION
INSERT

VS-28
TENSION
SCREW

VS-29W
WASHER
(2 REQ'D.)

VS-34
UPRIGHT ROD

502020032S34Z
WASHER, EXT. TOOTH,
5/16 O.D. x 5/32 I.D.

50S311B24S06B, SCREW,
5/16 - 18x3/8 LG. SLT. PAN HD.