5initial commissioning – STIEBEL ELTRON SOM 10 User Manual
Page 12

en
12
5
Initial commissioning
When the hydronic system is filled and ready for ope-
ration, connect the controller to the power supply.
The controller runs an initialization phase in which
the directional pad flashes red.
When the controller is commissioned for the first
time or when it is reset, it will run a commissioning
menu after the initialization phase. The commissioning
menu leads the user through the most important ad-
justment channels needed for operating the system.
Commissioning menu
The commissioning menu consists of the channels
described in the following. In order to make an ad-
justment, push button
5
. Adjust the value by pres-
sing buttons
4
and
2
, then bush button
5
to
confirm. The next channel will appear on the display.
5
5
adjustment mode
button navigation
changing a value
confirming a value
next parameter appears auto-
matically
2
4
1. Language:
Î
Adjust the desired menu language.
2. Units:
Î
Adjust the desired temperature unit.
Î
Adjust the desired volume unit.
Î
Adjust the desired pressure unit.
Î
Adjust the desired energy unit.
- SHZ 150 LCD (44 pages)
- SHZ 30 LCD (44 pages)
- DHE 18 SLI 25 A (176 pages)
- SN 5 SL (34 pages)
- sn 15 sli comfort (34 pages)
- DHB-E 13 SL (168 pages)
- SHW ... S 01.07.2003 - 23.01.2005 (32 pages)
- SNU 10 SLi с 23.04.2007 (30 pages)
- DHF 12 - 24 C 01.10.2006 - 31.03.2007 (52 pages)
- SH A с 01.03.2009 (72 pages)
- SHW ... S 24.01.2005 - 31.11.2007 (32 pages)
- SH A 02.07.2002 - 28.02.2009 (24 pages)
- PSH EL с 05.12.2011 (100 pages)
- SHD ... S 06.06.2006 - 12.04.2009 (20 pages)
- HDB-E Si с 01.02.2013 (80 pages)
- HTE electronic 5 с 11.05.2009 (80 pages)
- DHC-E 8-10-12 01.12.2011 - 13.02.2011 (40 pages)
- DHC-E 8-10-12 с 14.02.2011 (40 pages)
- PSH Universal EL с 05.12.2011 (100 pages)
- HDB-E Si 01.11.2012 - 31.01.2013 (72 pages)
- SH S electronic с 26.04.2004 (36 pages)
- SNU 5 SLi 01.05.2007 - 28.10.2007 (34 pages)
- SNU 5 SLi с 01.09.2007 (34 pages)
- SNU 5 SLi с 29.10.2007 (34 pages)
- DHF 12 - 24 C с 01.04.2007 (103 pages)
- HTE electronic 5 05.02.2007 - 10.10.2009 (32 pages)
- SB AC с 08.06.2009 (56 pages)
- HTT turbotronic 5 с 01.03.2009 (88 pages)
- PSH TM с 01.09.2008 (24 pages)
- SHW 200-400 ACE с 06.05.2013 (48 pages)
- SN ... SLi с 01.11.2007 (34 pages)
- SHW ... S с 06.05.2013 (84 pages)
- DHF .. C 01.02.2004 - 30.09.2006 (52 pages)
- SHD ... S с 13.04.2009 (60 pages)
- SHW ... S 01.11.2007 - 05.05.2013 (32 pages)
- DHF .. C 22.04.2002 - 31.01.2004 (52 pages)
- MINI 2-1 (32 pages)
- DHC 3-1 (32 pages)
- DHC-E 8/10 (32 pages)
- TEMPRA 36 PLUS (32 pages)
- SHC 2.5 (36 pages)
- SHC 2.5 (6 pages)
- SB 150 (9 pages)
- SBB 300 (15 pages)
- ASPHALT ROOF FLASHING KIT - 560105 (2 pages)