Head-sill-reinforcing – Oldcastle BuildingEnvelope ICR-225 User Manual
Page 32

29
March 2012
Phone: 1-866-OLDCASTLE (653-2278)
Web Address: www.oldcastlebe.com
I C R - 2 2 5 - I N S T A L L A T I O N M A N U A L
OPTIONAL HEAD & SILL REINFORCING
6” SYSTEM DEPTH ONLY
Optional reinforcing sleeves are available with Type “A” systems (head only) and Type “B” systems
(Head & Sill) when end reactions exceed 600 lbs.
Do not pre-install head anchors onto building condition.
B.1
Prior to assembling frame, slide reinforcing sleeves and head anchors into position as follows
SEE
FIGURE 32, page 30:
Type “A” & “B” Head: At head anchor locations or per approved shop drawings
Type “B” Sill: At each vertical or per approved shop drawings
B.2
Attach jambs and vertical mullions to the head and sill members. Refer to
STEP 2.4, page 9 for Type
“A” systems and
STEP 5.2, page 17 for Type “B” systems.
NOTE: Assembly screws for verticals and jambs run through the sill reinforcing sleeves.