SECTION VIII - DOOR FRAME INSTALLATION
Anchor the door frame as indicated below in Detail #59 and also in
See the parts description pages for the appropriate door jamb
jamb and continuing under the threshold to the opposite door jamb.
The concept is to have a continuous bead of sealant at the interior
sealant into the bead of sealant to be applied under the threshold.
Continuous bead
NOTE: If an entrance frame is required, it must be installed first.
K-124/K-125 Threshold Clip & Screws
K-153/K-154 Threshold Clip & Screws
@ Concealed Rod Panic
@ Offset Pivots & Butt Hinges
Detail # 59
(9950)
THRESHOLD
Detail #60, #62, and #64 through Detail #66 on page # 41.
Set assembled door frame in opening, plumb, and level.
SIDE LITE SILL MEMBER
The door jamb runs to the
than any other vertical
floor and is cut longer
member.
NOTE:
STEP 4)
STEP 3)
of sealant
and transom bar for the system being used.
and connected from the sill flashing condition through the door
to set the member into, and tie the side lite sealant or condition
Apply a bead of sealant around the interior portion of the jamb
Correctly locate the entrance frame in the opening.
STEP 2)
STEP 1)