beautypg.com

Step #29, Step #30 – EFCO 955 Series User Manual

Page 26

background image

Butter the top ends of the jambs and vertical mullions. Then attach the head

to the verticals with #STV3 screws. It will be necessary to coat the screws with

STEP #28

Detail #27

Detail #26

Detail #25

CONT.

SECTION V - ASSEMBLY

PAGE #24

Butter the bottom ends of the jambs and vertical mullions. Then attach the sill

STEP #29

glazing gasket (WMB9) with the frame laying flat. This is at the discretion of the installer.

Depending on the height of the assembled frame, it may be easier to install the exterior

STEP #30

Be sure to add approximately 2% of the cut length to prevent gaps at the gasket

JDA 8/2000

intersections.

wax before installation to prevent stripping. See details #25 and #26 below.

to the verticals with #STV3 screws. It will be necessary to coat the screws with
wax before installation to prevent stripping. See details #27 and #26 below.