Using butt glazed mullions, Detail #52, Step #52 – EFCO 955 Series User Manual

Page 38

background image

the spacer, and the butt glaze mullion together.

A clean professional application of the structural silicone is required here.

Fill the cavity created by the spacer with structural silicone, tying the glass unit,

out, before proceeding with the application of the structural silicone.

Be sure the glass units are set correctly and the butt glaze spacer is bottomed

This structural silicone joint will require an overnight cure.

WSA1

to hold it in place. The space will bottom out against the locator on the mullion.

glass unit. This gap should be small enough to provide tension on the spacer

Install the butt glazing spacer (WSA1) between the butt glaze mullion and the

Any type of temporary glazing retainer will have to be field fabricated and

USING BUTT GLAZED MULLIONS

SECTION VII - GLASS INSTALLATION

Detail #52

WSA1

STEP #52

installed by the contractor.

NOTE:

Detail #51

STEP #51

8663

JDA 9/2000

GLASS

UNIT

STRUCTURAL

SILICONE

MULLION

GAP

1/2"

WSA1

K368

K368

8663

CONT.

PAGE #36