1G59 STD. JAMB

glazing gasket (WMB9) with the frame laying flat. This is at the discretion of the installer.

Depending on the height of the assembled frame, it may be easier to install the exterior

Detail #31

STEP #35

Detail #30

8663 BUTT GLAZE

Butter the top ends of the jambs and vertical butt glaze mullions. Then attach the head

Detail #29

2G23

1G59 or 1G60

FRAME SILL

1G59 STD. JAMB

8663 BUTT GLAZE

2G23

2G23

VERTICAL

STEP #33

1G58 STD. HEAD

VERTICAL

REFERENCE SECTION VII

WILL BE FILLED WITH
THE K461 BRIDGE ASSEMBLY.

NOTE THE GAP BETWEEN
THE HORIZONTALS. THIS

CONT.

PAGE #26

Butter the bottom ends of the jambs and vertical butt glaze mullions. Then attach the

STEP #34

JDA 9/2000

Be sure to add approximately 2% of the cut length to prevent gaps at the gasket

intersections.

to the verticals with #STV3 screws. It will be necessary to coat the screws with

SECTION V - ASSEMBLY

wax before installation to prevent stripping. See details #29 and #30 below.

sill to the verticals with #STV3 screws. It will be necessary to coat the screws with
wax before installation to prevent stripping. See details #31 and #30 below.