Step #15 detail #14, Detail #13, Step #14 – EFCO 955 Series User Manual

Page 19: Step #13

background image

Refer to page 22 for assembly procedures.

now ready to be screw spline attached to the head and sill members.

If there are NO horizontal members being used, the vertical members are

1.187

STEP #15

Detail #14

1.187

TO HEAD

1G58 HEAD

VERTICAL MULLION

If the project is being built as head and sill thru, the vertical members will be cut to

The vertical members must also be coped to fit into the head.

Detail #13

See details #13 and #14 below.

D.L.O. plus (+) 1 3/16".

STEP #14

1G61

1G59 JAMB

SECTION IV - FABRICATION

INTERMEDIATE HORIZONTAL FACE

JAMB AND VERTICAL MULLION FABRICATION AND PREPARATION

STEP #13

(CONT.)

PAGE #17

JDA 9/2000