beautypg.com

Starting at slot csc0, Slide the card into the sl ot ( figure 3-24 ), Repeat step 2 for each card – Cisco XR 12410 User Manual

Page 114: Step 2, Step 4, Caution, Step 5, 2sf c, Air filter door, Clock scheduler card

background image

Chapter 3 Installing the Cisco XR 12410 Router

Reinstalling Cards in the Chassis

3-32

Cisco XR 12410 and Cisco XR 12810 Router Installation Guide

OL-17441-01

Step 2

Starting at slot CSC0:

d.

Slide the card into the slot (

Figure 3-24

).

a.

Pivot the ejector levers to seat the card to the backplane connector.

Figure 3-24

Reinstalling a Clock Scheduler Card into the Switch Fabric and Alarm Card Cage

Step 3

Repeat Step 2 for each card.

Step 4

Close the air filter door and tighten the captive screws to prevent the door from
opening during chassis installation.

Caution

The air filter door must be closed and secured at all times to maintain correct EMI
performance.

Step 5

Go to the

“Reinstalling Cards in the Line Card and RP Card Cage” section on

page 3-33

to reinstall the line cards and RP.

ALARM

2

SF

C

53270

Air filter door

-3/STM-POS

6DS3–SMB P

/

H

/

F

12DS3–SMB P

/

H

/

F

-48/STM-16-SCPOS

OC-12/STM-4 A

T

M

ST ETERNET

E PR

OCESSOR

Clock scheduler card