Reinstalling dc pems – Cisco XR 12410 User Manual
Page 111

3-29
Cisco XR 12410 and Cisco XR 12810 Router Installation Guide
OL-17441-01
Chapter 3 Installing the Cisco XR 12410 Router
Reinstalling Components After Installing the Chassis
Reinstalling DC PEMs
Use the following procedure to reinstall the DC PEMs back into the chassis.
Step 1
Install the DC PEM (
):
a.
Slowly push the power supply into the chassis until it mates with the
backplane connector at the back of the bay.
Caution
To prevent damage to the power shelf backplane connector, do not use excessive
force when inserting a power supply into the chassis.
b.
Lift the ejector lever into place and tighten the captive screw to securely seat
the power supply to the backplane connector.
Figure 3-21
Installing a DC PEM
Step 2
Repeat Step 1 for the other power supply.
Step 3
Go to the
“Reinstalling the Blower Module” section on page 3-30
blower module.
129276
- ASA 5505 (1994 pages)
- OL-15491-01 (268 pages)
- WUSB600N (43 pages)
- 10000 (556 pages)
- 10000 (12 pages)
- 3825 (358 pages)
- WRV54G (101 pages)
- WUSB54GC (33 pages)
- 2600 Series (10 pages)
- DPQ2202 (38 pages)
- 1600 (13 pages)
- WRT320N (53 pages)
- 1701 (10 pages)
- 300 (16 pages)
- 3200 Series (60 pages)
- 2900 SERIES XL (138 pages)
- 4430 (12 pages)
- 1005 (6 pages)
- 3500 Series (8 pages)
- GigaStack WS-X3500-XL (58 pages)
- WIRELESS-G WRT54GP2 (112 pages)
- 1604 (22 pages)
- 3600 Series (18 pages)
- WIRELESS LAN CONTROLLER OL-17037-01 (80 pages)
- DPC3000 (36 pages)
- 3545 MCU (56 pages)
- WRT110 (48 pages)
- 7300-6T3 (54 pages)
- 10BASE-FL (40 pages)
- 340 (62 pages)
- 1700 (88 pages)
- 1700 (14 pages)
- 12000 (60 pages)
- 3600 (18 pages)
- 1800 Series (12 pages)
- 2000 (6 pages)
- ACE XML OL-13877-01 (12 pages)
- 10720 (26 pages)
- 10008 (38 pages)
- 10008 (48 pages)
- 1-PORT G.SHDSL 2600 (22 pages)
- XM Universal Gateways Cisco AS5400XM (100 pages)
- 1710 (12 pages)
- WRTP54G (114 pages)
- 7201 (4 pages)