Edge Lighting Light Channel, Millwork 24V User Manual
Millwork light channel, 24vdc, Install the light channel, Installation instructions for
Installation Instructions for
Millwork Light Channel, 24VDC
Install the Light Channel
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
© 2013 Edge Lighting. All Rights Reserved.
SAVE THESE INSTRUCTIONS!
- This instruction shows a typical installation.
IMPORTANT INFORMATION
1: Determine the location of the Millwork Light Channel on the
wood.
B
LIGHT CHANNEL
ADDITIONAL
LIGHT CHANNEL
904-LCMW-24V-01
1
LCMW-24V-_
NOTE:
3/4" thick wood. The cut out slot must be 7/8" wide and 5/8"
deep. Add 1-3/8" to the length of the channel to accommodate
the power cord spacing.
The Millwork Light Channel needs to be installed onto a
2: Remove the two screws on the bottom of the light channel
(not the screws holding the decorative cap).
3: Place the male end of the power cord in the cord grip if
connecting to the female end of the light channel, or place
the female end of the power cord in the cord grip if
connecting to the male end of the light channel.
4: Push the cord completely into the light channel power end
cap pins and secure the cord grip to the light channel by
tightening the two screws (provided with cord grip) through
the cord grip into the light channel power end cap.
C
POWER FEED
CONNECTOR
FLEXIBLE
CONNECTOR
LIGHT CHANNEL
DECORATIVE
CAP
2
3
LIGHT
CHANNEL
END CAP
POWER FEED
CONNECTOR
SCREW
POWER FEED
WIRES
SCREW
4
FLEXIBLE
CONNECTOR
5/8"
CUT
DEPTH
7/8" CUT
CHANNEL
LENGTH
1 3/8"
FOR
CORD
A
NOTE:
connected together with the flexible connectors. Refer to the
instructions provided with the flexible connectors.
Multiple light channels up to total of 25 feet long can be
NOTE:
female or male end of the channel.
The power feed cable can be mounted to either the
WOOD
MITER CUT
7/8" WIDE