beautypg.com

Edge Lighting 2 Circuit Standoffs - Sloped Ceiling User Manual

Monorail 2 circuit sloped ceiling standoffs, Install the standoff hardware, Installation instructions for

background image

C

M3 SET SCREW

1.5MM ALLEN
WRENCH

THREADED
POST

1

#8 SCREW

INTEGRATED
WASHER-NIPPLE

ANCHOR

4

M2S-SL-_

- This product is ETL listed for indoor dry locations.
- The product is intended to be used with Edge Lighting
Monorail 2 Circuit systems only.
- Use Monorail 2 Circuit standoffs where the Monorail 2
Circuit sections join together and approximately every 3
feet max throughout the Monorail run.

Monorail 2 Circuit Sloped Ceiling Standoffs

Installation Instructions for

904-M2S-SL-02

IMPORTANT INFORMATION

1718 W. Fullerton Ave

Chicago, IL 60614

Tel: 773-770-1195

Fax: 773-935-5613

www.edgelighting.com

[email protected]

A

Install the Standoff Hardware

1: Hold the Monorail 2 circuit section against the ceiling or use
a plumb bob to mark the sloped standoff locations onto the
ceiling (this may require more than one person).

2: Tap the anchors onto the marked locations up to the
threaded portion with a hammer.

3: Screw the threaded portion of the anchors in with a Phillips
screwdriver.

ANCHOR

CEILING

2

B

4: Mount the integrated washer-nipple to the anchor with the
#8 screw provided.

5: Tighten the threaded post completely onto the integrated
washer-nipple.

1: Push the sloped standoff connector completely into the
threaded post and tighten the M3 set screw with the 1.5mm
Allen wrench.

SAVE THESE INSTRUCTIONS!

3

THREADED POST

5

Sloped Standoff Connector
Power Feed Canopies

Installation for Monorail 2 Circuit

1

SLOPED STANDOFF
CONNECTOR

© 2009 Edge Lighting. All Rights Reserved.

Table of contents