Humboldt 5000 BLU Light Weight Deflectometer User Manual
Page 92

92
(1) Types of railway lines according to modulus 413.0202
P
300
High-speed traffic
300 km
P
230
Passenger traffic line (upgraded)
230 km
M 230
Mixed traffic line (upgraded)
230 km
P
160
Passenger traffic line (I+II)
160 km
M 160
Mixed traffic line
160 km
G 120
Freight transport line
120 km
R
120
Regional transport line
120 km
G
80 Regional transport line
80 km
G
50 Freight transport line
50 km
(2) Dynamic deflection modulus: For conditions of use see article 6; paragraph 5 for subgrade:
1. Value for coarse-grained soil
2. Value for mixed and fine-grained soil
(3) This thickness assumes a hydraulically bound base course of at least 30 cm under the solid track.
(4) as well as coarse-grained soils, gravels and sands with wide or intermittent grain size distribution; see modulus 836.0503, article 3
(5) when improving lines for high-speed traffic
Extract from German standard RIL 836 - Deutsche Bahn AG
836.501
RIL 836- Earthwork structures – design, construction and maintenance
Seite 10
Standard for embankments and cuttings
11.2 RIL 836 – German National Railway Company Deutsche Bahn AG
Requirements for railway track substructure under embankments or cuttings
Type of railway line Top soil Protective layer Subgrade general assembly
Material mix
Standard thickness
[cm]
area affected by frost
Line category
1)
Track ballast [MN/m
2
]
(-)
I
II
III
[MN/m
2
] embankment cutting
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Ballast track
120
50
KG 1/2
1,00
70
70
70
80
40/35
A 1.1
A 1.3
P 300
Solid track
120
50
KG 2
1,00
3)
40
3)
40
3)
40
60
35/30
A 1.2
A 1.4
120
50
KG 1/2
1,00
50
60
70
60
40/35
A 1.9
A 1.7
P 230
M 230
120
50
KG 2
1,00
3)
40
3)
40
3)
40
60
35/30
A 1.6
A 1.8
P 160, M 160
G 120, R 120
100
45
KG 1/2
1,00
40
50
60
45
35/30
A 1.9
A 1.10
New construction
R 80, G 50
all other lines
80
40
(KG 1/2)
4)
1,00
30
40
50
45
30/25
A 1.11
A 1.12
80
40
KG 1/2
1,00
30
40
50
45
30/25
A 1.13
A 1.13
P 230
M 230
100
45
KG 2
1,00
3)
40
3)
40
3)
40
45
30/25
A 1.14
A 1.14
P 160, M 160
G 120, R 120
50
35
KG 1/2
1,00
20
25
30
30
25/20
A 1.15
A 1.15
R 80, G 50
all other lines
40
30
(KG 1/2)
4)
0,97
20
20
20
20
25/20
A 1.16
A 1.16
Maintenance Impro
vement
Ballast track
Solid track
Ballast track
Ballast track
Ballast track
Solid track
Ballast track
Ballast track
5
)
D
pr
E
v2
acc. attachment 1, figure
E
vd
2)
E
v2
E
vd
2)
The test must be performed and evaluated according to German standard TP BF StB Part B 8.3.
For general information only! All details are subject to change.