Auger unloading: rear hopper – Great Plains NTA3007 Operator Manual User Manual
Page 82

78
NTA907 or NTA3007
Great Plains Manufacturing, Inc.
166-371M
2012-07-02
Auger Unloading: Rear Hopper
1.
Position drill well clear of overhead electrical lines.
2.
Raise openers (page 43) and fold wings (page 45).
3.
Lower openers (page 42) to provide maximum
clearance at centre section.
4.
Shut down hydraulics or set Fan/Auger circuit to
Float or Neutral.
5.
Open lid slightly on rear hopper.
Deploy auger (page 60).
7.
Swing inlet hopper under rear meter.
(see page 80 for additional steps if unloading front
hopper)
8.
Position collection bin or vehicle under auger outlet.
9.
Install the calibration crank (page 69).
Unload Prep.: Hydraulic Circuit Operation
Lift
Fan,
Auger
Fold, Tilt,
Marker
Transport
Hooks
Neutral
Float or
Neutral
Neutral
Neutral
Figure 81
Unload Rear Hopper with Auger
32393
29409
NEUTRAL