Great Plains 3PYPA Predelivery Manual User Manual
Pre-delivery, Manufacturing, inc

Manufacturing, Inc.
© Copyright 2012
Printed 2012-08-08
401-647Q
EN
ORIGINAL INSTRUCTIONS
Pre-Delivery
3PYPA
3-Point 40-Foot Yield-Pro
®
Planter
with Air-Pro
®
Seed Meters
Read the operator manual entirely. When you see this symbol, the
subsequent instructions and warnings are serious - follow without
exception. Your life and the lives of others depend on it!
Illustrations may show optional equipment not supplied with standard unit,
or may show similar 3PYP models and their options.
29852
Table of contents
Document Outline
- Pre-Delivery
- Table of Contents
- Important Safety Information
- Look for Safety Symbol
- Be Aware of Signal Words
- Use Adequate Lifting Means
- Prepare for Emergencies
- Be Familiar with Safety Decals
- Wear Protective Equipment
- Avoid High Pressure Fluids
- Tire Safety
- Practice Safe Maintenance
- Use Safety Lights and Devices
- Transport Machinery Safely
- Shutdown and Storage
- Safety At All Times
- Introduction
- Plan The Mainframe Unload
- Unloading
- Planter Assembly
- Press Wheel Shipping
- Shipping Stands
- Prepare Parallel Arms
- Mount Seed Box Frame
- Install Casters
- Connect Steering Hoses
- Route Steering Sensor Lead
- Route Lighting/Seed Box Leads
- Adjust Air Box Pads
- Connect Seed Hose Rack
- Seed Hose Routing
- Connect Seed Hoses
- Install Lower Walkboard Step
- Install Press Wheel Assemblies
- Install Row Unit Side Wheels
- Hopper Installation
- Row Unit Options
- Planter Closeout
- Console Installation
- Tractor Steering
- Install Switchbox
- Install GP Linear Sensor
- Install Electronic Module
- Install Gray Module Harness
- ISObus Compatible Connection
- Install Harness for Native Steering Sensor
- Install Module Output Harness
- Steering Calibration
- Steering Troubleshooting
- Appendix A - Reference Information
- Index