Electrical installation, Electrical connections, Lights – Great Plains TSF1260 Operator Manual User Manual
Page 31: Raven scs 440

Great Plains Manufacturing, Inc.
Preparation and Setup
27
01/12/2012
500-642M
Electrical Installation
Prior to first use, complete these items (or verify that they
have been completed), then make the tractor-sprayer
electrical connections (see page 22).
Electrical Connections
For a new sprayer (or moving to a different tractor), first
complete tractor electrical installation (See “Electrical
Installation” on page 27), and installation of any sprayer
Options not factory- or dealer-installed.
Lights
Refer to Figure 22
The lights and harness are standard, and pre-installed
on the sprayer, but require the common SAE J560B 7-
pin receptacle on the tractor. If your tractor doesn’t have
this connector, your dealer can assist you with the instal-
lation of one.
Raven SCS 440
The Raven SCS 440 (Sprayer Control System) is stan-
dard, and the sprayer-side components (other than
speed sensor) are pre-installed.
The SCS 440 system consists of a computer-based Con-
trol Console, a Speed Sensor, a turbine type Flow Meter
and a motorized Control Valve. The Console mounts
directly in the cab of the tractor for easy operator use.
The Radar Speed Sensor is mounted to the frame of the
tractor or sprayer (wheel drive and speedometer Drive
Speed Sensors are also available.) The motorized Con-
trol Valve and Flow Meter mount to the framework sup-
porting the boom valves. Appropriate cabling is furnished
for field installation.
The controller module must be installed in the tractor cab
prior to first use, and must be connected to one or more
tractor systems, including:
• battery power (red:+, black:-)
• existing or new speed sensor, if tractor-mounted (and
if new tractor mount, the sensor must be installed)
Your Great Plains dealer can assist with the installation.
A Raven installation and service manual are provided.
Once installed and connected for the first time, setup and
calibration steps are necessary prior to first field opera-
tions. See “Sprayer Calibration” on page 31.
It is important to read and understand the Raven manual
before operating the system.
Connection
Comment
❑ Lights
Standard
❑ Raven Controller
Standard
❑ Electro-Hydraulics
Standard (two connectors)
❑ Foam Marker
Optional
❑ Raven G1 Autoboom Optional
❑ Wheel Sensor
Optional
❑ Radar Sensor
Optional - routine hook-up
necessary only if sensor is
mounted on sprayer
Figure 22
Tractor Lighting Connector
26467