beautypg.com

Install the boot on the auger tube, Warning – Wheatheart X Series 13 Augers User Manual

Page 29

background image

W

HEATHEART

- X13 S

ERIES

A

UGERS

3. A

SSEMBLY

X1374, X1384, X1394

3.4. I

NSTALL

THE

B

OOT

ON

THE

A

UGER

TUBE

30787 R1

29

3.4. INSTALL THE BOOT ON THE AUGER TUBE

.\

See Table 3.4. for a list of parts required to install the boot on the auger tube.

Note:

The gearbox is sent from the factory filled half way with EP90 gear oil. Before
further assembly, check oil level to make certain the gearbox is half full. Add oil if
necessary. Do not use grease.

1. The boot flighting comes pre installed on the end of the lower tube flighting

shaft (See Figure 3.5). Ensure that the flighting is fastened with a

1/2'' X 4” GR8 bolt and 1/2” locknut before proceeding.

Figure 3.5 Check Boot Flight Bolt and Nut

Table 3.4. Parts Required, Installing the Boot on the Auger Tube

Part Number

Description

Amount

29991

X13 boot assembly

1

29999

X13 boot-tube attach plate

1

18698

7/16” X 1-1/4” bolts

21

17593

7/16” locknuts

21

WARNING

Components are heavy and create a crushing
hazard if improperly handled. Be sure to use
proper hoisting equipment and procedures,
and ensure lifting apparatus is secure. Lock
out the lifting apparatus before working
around or under the raised components;
failure to do so may cause serious personal
injury.

1/2” LOCKNUT

1/2” X 4” GR8 BOLT