3.3. ASSEMBLE THE MAIN AUGER TUBE

See Table 3.3. for a list of hardware required to assemble the main auger tube.

1. Align

tube

sections on a series of support stands, placing a support stand at

the end of each tube. If possible, make sure that support stand height is
equal across all tubes to ensure that tubes are level with each other.
Otherwise, use some form of shim to keep the tubes level across all of the
support stands.

Important:

Always strap tubes to the support stands to prevent the tubes from rolling off the
stands and onto the floor.

2. Working from the spout end (upper tube) to the discharge end (lower tube),

connect the tubes together as shown in Figure 3.4, as described below:

a. Align flightings to ensure a continual spiral of auger surface, and connect

flight shafts with 1/2” x 4” bolts and 1/2” locknuts.

b. As flight shafts are connected, slide tube sections together and secure with

7/16'' X 1-1/4'' GR8 bolts and 7/16” locknuts.

Figure 3.4 Connecting Auger Tubes and Flights

Table 3.3. Parts Required, Assembling the Main Auger Tube

Part Number

Description

X130-74 X130-84

X130-94

18974

1/2” x 4” bolts

3

3

4

17750

1/2” locknuts

3

3

4

18698

7/16'' X 1-1/4'' bolts

48

48

64

17593

7/16” locknuts

48

48

64

1/2” LOCKNUT

7/16” X 1-1/4” BOLTS

7/16”

1/2” X 4” BOLT

LOCKNUTS