INSTALLING THE AT10.1
• Run the cable though a conduit if possible, but not through a conduit
containing any power wiring.
• Route the other end to the probe at the battery and coil up excess cable.
NOTE: If the standard (25ft / 7.6m) cable is not long enough, longer 
cable assemblies are available in lengths of 50, 100 & 200ft / 15.2, 
30.5 & 61.0m. See Appendix B on page 71 for ordering information. 
• Be sure your wiring conforms to the NEC and your facility requirements. 
5. Attach the interconnection cable to the AT10.1 as shown in the figure below:
• Route the
cable within 
the AT10.1 
enclosure so it 
runs with the 
wire harness 
to the back of 
the front 
panel, and 
easily reaches 
the main 
control circuit 
board. 
• At the main
control circuit 
board, insert 
one of the bare 
wires from the 
cable into each 
terminal of 
TB8. Polarity 
is not 
important. 
• Unplug the harness ground wire # 30 from terminal J6 on the left edge of
the main control circuit board. Plug the connector at the end of the 
nylon-shielded wire of the cable assembly onto J6. Reconnect the 
ground wire # 30 from the system harness onto the piggy-back connector 
featured at the end of the nylon-shielded wire. 
• Using plastic wire ties, fasten the interconnection cable loosely to the
existing wire harness. Make sure that the cable conforms to the service 
loop at the hinge end of the door. 
6. At the battery, connect the quick-connect terminals to the temperature
compensation probe. Polarity is not important. Coil up any excess wire and 
tape or tie it together to prevent damage. 
21