Section 3 torch: installation, 3t.01 torch connections, 3t.02 cnc connection – Tweco A80-A120 CutMaster User Manual
Page 27: Section 3 torch, Installation t-1
CUTMASTER A80, A120
Manual 0-5119
INSTALLATION
3T-1
SECTION 3 TORCH:
INSTALLATION
3T.01 Torch Connections
If necessary, connect the torch to the Power Supply.
Connect only the Thermal Dynamics model SL100SV
/ Automation, SL100 / Mechanical or SL100 / Manual
Torch to this power supply. Maximum torch leads
length is 100 feet / 30.5 m, including extensions.
WARNING
Disconnect primary power at the source before
connecting the torch.
1. Align the ATC male connector (on the torch
lead) with the female receptacle. Push the
male connector into the female receptacle. The
connectors should push together with a small
amount of pressure.
2. Secure the connection by turning the locking
nut clockwise until it clicks. DO NOT use the
locking nut to pull the connection together. Do
not use tools to secure the connection.
1
2
Art # A-07885
Connecting the Torch to the Power Supply
3. The system is now ready for operation.
Check Air Quality
To test the quality of air:
1. Put the ON / OFF
switch in the ON
(up) position.
2. Put the Function Control switch in the SET
position.
3. Place a welding filter lens in front of the torch
and turn ON the air.
Do not start an arc!
Any oil or moisture in the air will be visible on
the lens.
3T.02 CNC Connection
1. Locate the interface connection port on the rear
of the power supply.
Automation Interface
Cable Port
Art # A-08464
2. Note the pin-out of the connector and that the
customer supplied connector matches.
Art # A-08323
Plasma
Start / Stop
Signal
Cutting Machine
OK to Move
3. Connect CNC to the power supply.