beautypg.com

Appendix 8: publication history – Tweco A80-A120 CutMaster User Manual

Page 102

background image

CUTMASTER A80, A120

APPENDIX A-12 Manual 0-5119

APPENDIX 8: PUBLICATION HISTORY

Cover Date

Rev.

Change(s)

Dec. 10, 2008

AA

Manual released.

May 29, 2009

AB

Updated 400V/600V schematic in appendix per ECOB1399 and updated

230/460V schematic per ECOB1357. Corrected part numbers in section 6 per

ECOB1201.

Oct. 20, 2009

AC

Updated Tip and Electrode part numbers per ECOB1494 changing 9-8215 to 9-

8232 and 9-8253 to 9-8233.

Jan. 7, 2010

AD

Updated "Power Supply Input Cable Wiring Requirements" with metric power

cable sizes in Section 2. Updated torch consumables art section 4T and 6.

Updated automation interface and harness descriptions and part numbers per

ECOB1282.

Feb. 25, 2010

AE

Updated CNC cable part numbers in section 6 per ECOB1637.

Mar. 14, 2011

AF

Updated power cord part number in section 6 per ECOB1234.

June 23, 2011

AG

Added Appendix 7: Raw Arc Voltage

Mar. 20, 2012

AH

Updated ART A-08066 and changed COO text, per ECOB2149.

April 10, 2014

AJ

Revised to Victor trade dress standards.