beautypg.com

Fixed flap linkage installation – E-flite RV-9 450 ARF User Manual

Page 18

background image

18

E-flite RV-9 450 Assembly Manual

Insert a 4-40 socket head bolt into each hole to

keep the plate in position while tracing the outline.

11. Use a hobby knife with a new #11 blade to

remove the covering 1/16-inch (1.5mm) inside the

line drawn in the last step.

Use rubbing alcohol and a paper towel to

remove the line drawn on the bottom of the

wing before installing the wing bolt plate.

12. Use medium CA to glue the wing bolt plate to

the bottom of the wing. Make sure the holes in the

plate are aligned with the holes in the wing before

the CA has cured.

You should now decide between fixed or operational

flaps. If you will be using operational flaps then you

should skip to that section on the next page.

Fixed Flap Linkage Installation

Required Parts

Wing assembly

Flap linkage

Clevis (2)

Clevis retainer (2)

Flap control horn (2) Fixed flap servo cover

Connector backplate Nylon pushrod connector

2mm x 5mm machine screw

2mm x 6mm sheet metal screw (4)

Required tools

Pliers

Phillips screwdriver: #1

Thin CA

1. Locate two clevises and clevis retainers. Slide the

retainers onto the clevises. Thread the clevises on

the flap linkage 16 turns.

2. Thread the flap control horns on the flap control

rods until the top of the horn is aligned with the top

of the threaded rod.