beautypg.com

Installation checklist – Rockwell Automation 2090-xxx Fiber Optic Cable Installation and Handling Instructions User Manual

Page 6

background image

6 Fiber Optic Cable Installation and Handling Instructions

Publication 2090-IN010C-EN-P – April 2005

Use proper cable pulling techniques when routing cables. See

the section Fiber Optic Cable Pulling Techniques earlier in this
manual.

Attach cables with plastic clamps having large surface areas.

Avoid pinching or squeezing cable. Cable clamps should be installed
manually with gentle pressure.

Figure 6 Proper Use of Plastic Clamps

Installation Checklist

Use the following installation checklist to ensure proper handling.

Installation Procedure

Complete

Comments

Maximum cable length not exceeded

Bending radius not exceeded

Maximum tensile load not exceeded;

proper pulling techniques used

Cable not squeezed or bent

Cable installed without loops in raceways

Cable protected from sharp edges

Fiber cable installed in separate raceways from copper

Cable connector cleanliness maintained

Cable connector finger tight to transceivers