beautypg.com

Operation detaching the header – MacDon 9250 SP User Manual

Page 47

background image

Form # 46584

Issue 11/06 Web Rev_01

45

OPERATION


Detaching the Header


1. Activate header lift cylinders (switch on ground

speed lever) to raise header fully. For units with
Header Express Down option, use switch on
side console to bypass the feature. Lower the
reel (second switch on lever). Stop engine and
remove key.


2.

DANGER: To avoid bodily injury from
fall of raised header, always engage
header lift cylinder stops (A) when
working on or around raised header.


3. Remove "L" pin (B), both sides and detach float

springs.


















4. Remove pin (C) from lower header leg, both

sides.







5. Lower header stand into position (E).

942 Multi-Crop Header: Place 2 inch (50 mm)

blocks under cutterbar at both ends of header.


6. Disengage header lift cylinder stops.

7. Be sure area is clear of bystanders, then start

engine. Retract lift cylinders to fully lower
header. Stop engine and remove key from
ignition.

















































A

ENGAGE LIFT CYLINDER STOPS

B

DETACH FLOAT SPRINGS

C

L-PIN DESIGN

CLEVIS PIN DESIGN

REMOVE HEADER PINS

C

E

HEADER STAND - DOWN POSITION

963 HEADER STAND

This manual is related to the following products: