beautypg.com

Operation break-in period, Pre-starting checks: annual – MacDon 9250 SP User Manual

Page 32

background image

Form # 46584

Issue 11/06 Web Rev_01

30

OPERATION


Break-in Period


WINDROWER BREAK-IN (Continued):

8. Re-torque four walking beam pivot bolts (B)

after the first 50 hours. Tighten to 265 ft. lbs.
(360 N·m.)
NOTE: For units with optional “behind-frame”
weight package as shown, tighten hardware to
350 ft. lbs. (470 N·m.)



Pre-Starting Checks: Annual


Do the following at the start of each operating
season:


CAUTION:

1. Review the Operator's Manual to refresh

your memory on safety and operating
recommendations.


2. Review all safety signs and other decals on

the windrower and note hazard areas.


3. Be sure all shields and guards are properly

installed and secured. Never alter or
remove safety equipment.


4. Re-acquaint yourself with the controls

before beginning operation.


5. Store a properly stocked first aid kit and

charged fire extinguisher on the
windrower.


Also:

6. Drain off excess hydraulic oil added for stor-

age. See "Hydraulic System" in Maintenance/
Service section.

7. Remove plastic bags and/or tape from all

sealed openings (air cleaner intake, exhaust
pipe, fuel tank).

8. Charge battery and install. Be sure terminals

are clean and cables are connected securely.

9. Adjust tension on A/C compressor belt. See

Maintenance/Service section.

10.

Cycle blower switch to distribute A/C
refrigerant oil. See Maintenance/Service
section.

11. Perform all Annual maintenance. See Main-

tenance/Service section.

B

RE-TORQUE WALKING BEAM BOLTS

AFTER 50 HOURS

This manual is related to the following products: