Assembly battery, Adjustments and checks, Cab heater – MacDon 9250 SP User Manual
Page 141
Form # 46584
Issue 11/06 Web Rev_01
139
ASSEMBLY
Battery
INSTALL BATTERY
NOTE: For easier installation, position a low
platform on which to stand when placing battery.
1. Lower battery from above onto battery tray
located at left rear corner of frame. Position +
post towards rear of machine.
2. Install battery holder (A).
CONNECT BATTERY CABLES
1. Connect starter cable (B) to positive (+) terminal
on battery.
2. Connect ground cable (C) to negative (-)
terminal on battery.
3. Be sure connections are clean and tight.
WARNING: Do not run the engine
with battery cables disconnected.
High voltage can build up in the
frame, creating a shock hazard.
Alternator damage will also result.
When the preceding assembly work is complete,
the windrower tractor is in running condition.
WARNING: Avoid driving the tractor
with header removed. Removing
header decreases the weight on
drive wheels, reducing steering
control. If necessary to drive tractor with
header removed, use transmission low speed
range, do not exceed HALF maximum engine
speed and avoid loose gravel and slopes. Refer
to instructions in this manual on Starting,
Driving and Stopping the Windrower.
Adjustments and Checks
Perform the final checks and adjustments as listed
on the "Pre-Delivery Checklist" (yellow insert) to
ensure the machine is field-ready. Use the
Operator's Manual for directions.
NOTE: See following pages for Assembly
Instructions related to specific headers and
attachments. Once these details are completed,
attach header to tractor. See Operation section.
Cab Heater
There is a shut-off valve on the heater circuit at the
engine. The tractor is shipped with this valve in the
closed position to ensure there is no leakage
through the heater circuit when it is not being
used. This provides maximum cooling when the air
conditioning system is used. If heater is to be
used, open valve at (A).
A
B
C
INSTALL BATTERY
A
OPEN HEATER VALVE IF REQUIRED