Page 65: 8final works
Final works
Initial commissioning at a mains voltage of 400 V
8
l
65
EDK94ARN24 DE/EN/FR/ES/IT 2.1
8
Final works
8.1
Initial commissioning at a mains voltage of 400 V
The regenerative power supply module can be operated at a mains voltage of 400 V after
it has been installed according to these mounting instructions.
For this purpose, regenerative feedback is activated via the digital RFR input.
How to proceed:
1. Switch−on the mains voltage of 24 V.
– for the mains filter
– for the regenerative power supply module (optional)
2. Switch−on the mains voltage of 400 V.
3. Activate/deactivate regenerative feedback via the digital RFR input.
8.2
Initial commissioning at a mains voltage of 230 or 500 V
At first, the mains voltage must be set in the regenerative power supply module for the
operation at a mains voltage of 230 or 500 V. The setting will be done in C00173 and can
be carried out using a keypad or the Lenze Engineer PC software.
Required for the commissiong:
ƒ
A EZAEBKx00xkeypad
or
ƒ
A computer with a Windows® operating system (XP or 2000)
ƒ
The Lenze Engineer PC software
ƒ
A connection to the regenerative power supply module via an interface, e.g.
– X6 diagnostic interface with USB diagnostic adapter
– CAN system bus
– Communication modules in the M1/M2 expansion slots
ƒ
The software manual for the technology application used
ƒ
The communication manual for the network of the automation platform
ƒ
Switch−on the mains voltage of 24 V.
– for the mains filter
– for the regenerative power supply module
After the setting has been carried out according to the existing mains voltage:
1. Switch−on the mains voltage.
2. Activate/deactivate regenerative feedback via the digital RFR input.