2 fieldbus status displays, Fieldbus status displays, Fieldbus status displays ( 47) – Lenze E94AYCEC User Manual
Page 47: 8diagnostics
Lenze · E94AYCEC Communication module (POWERLINK CN) · Communication Manual · DMS 3.0 EN · 08/2014 · TD17
47
8
Diagnostics
8.1
LED status displays
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
8.1.2
Fieldbus status displays
The BS LED indicates the fieldbus status.
E94YCEP001E
BS: Bus Status
LED
Colour
Status
Description
BS
Green
Off
The communication module is not active on the fieldbus or is in the
INIT state.
Blinking
The
POWERLINK
network is in the initialisation phase.
NMT_MS_PREOPERATIONAL_1 / NMT_CS_PREOPERATIONAL_1
Blinking
The
POWERLINK
network is in the initialisation phase with cyclic
traffic.
NMT_MS_PREOPERATIONAL_2 / NMT_CS_PREOPERATIONAL_2
Blinking
The
POWERLINK
node is waiting for the start signal.
NMT_MS_READY_TO_OPERATE / NMT_CS_READY_TO_OPERATE
Blinking
The
POWERLINK
node has not found a Managing Node and is in
NMT_CS_BASIC_ETHERNET
Blinking
The
POWERLINK
node is in the "Stopped" status (waiting for
disconnection).
NMT_CS_STOPPED
On
The
POWERLINK
node is in the operating phase.
NMT_MS_OPERATIONAL / NMT_CS_OPERATIONAL
1 s
1 s
1 s
50 ms
200 ms
200 ms