Defining the minimum cycle time of the PLC project

9.2

Optimising the system

46

Lenze · Controller-based Automation · PROFIBUS® Communication Manual · DMS 4.3 EN · 04/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

9.2

Optimising the system

How to optimise the system:

1. Use the menu command Online Login, or log in on the Lenze Controller with +.

• For this, the PLC program must be error-free.
• With the log-in, the fieldbus configuration and the PLC program are loaded into the

Controller.

2. Check the task processing times.
3. Optimising the cycle times:

• If technologically required, the cycle times of the remaining tasks with lower priorities

can be decreased.

• Condition: No task with a low priority must assign more than 60 percent of the

corresponding cycle time in its task utilisation.