beautypg.com

6commissioning of profibus – Lenze PROFIBUS Controller-based Automation User Manual

Page 29

background image

Lenze · Controller-based Automation · PROFIBUS® Communication Manual · DMS 4.3 EN · 04/2014 · TD17

29

6

Commissioning of PROFIBUS

6.2

Detailed commissioning steps

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. Go to the Standard project dialog window and select the target system in the

Device

selection field:

Lenze Logic Controller

For actuating controllers that execute simple movements, have no Motion functionality,

or are controlled via pure PLC functionalities.

Lenze Motion Controller

Only if an additional Motion bus with EtherCAT is used (see

Mixed operation PROFIBUS

with EtherCAT

( 42)

)

Further optional project settings

Selection of the Lenze control technology release version

Selection of the compiler version

Selection of the programming language:

• Sequential function chart (SFC)
• Instruction list (IL)
• Continuous Function Chart (CFC)
• Function block diagram (FBD)
• Ladder diagram (LD)
• Structured text (ST)

5. Confirm the selection by clicking OK.