beautypg.com

Rigid shear shank and shovel installation – Landoll 2111 Coulter Chisel User Manual

Page 48

background image

3-16

F-719-0413 Edition

ASSEMBLY INSTRUCTIONS

Rigid Shear Shank and Shovel
Installation

1.

Attach each shank assembly to each clamp
assembly using 3/4-10 x 4 hex head cap screws and
hex lock nuts in the top hole and 5/8-11 x 5-1/2 hex
head cap screw and hex lock nut in the lower hole
(See Figure 3-8.)

IMPORTANT

5/8 x 3/4 x 1-1/4 connex bushings shown in the
drawing are installed at the Landoll Corporation.

2.

Install 2 x 1 x 18 spikes or 1/2 x 4 x 26 twisted
shovels onto shanks as follows:

a.

Connect 2 x 1 x 18 spike to each shank using
1/2-13 x 3 hex head cap screws, flat washers,
and heavy hex nuts (See Figure 3-8.)

b.

Connect 1/2 x 4 x 26 twisted shovels to each
shank using 1/2-13 x 3 plow bolts, flat washers,
and heavy hex nuts. See Figures 2-2 thru 2-10
for recommended locations of right hand and
left hand shovels.

IMPORTANT

Right and left twisted shovels are determined by
direction of dirt flow when facing the direction of
travel.