Chapter 3: installation, Before you begin, Site requirements – ElmoMC Multi-Axis Motion Controller-Gold Maestro User Manual
Page 13: Working environment, Unpacking the components, Chapter 3, Installation, Site requirements 3.1.2. working environment

Gold Maestro Installation Guide
MAN-GOLD-MAESTRO-IG (Ver. 1.301)
13
Chapter 3:
Installation
3.1. Before You Begin
3.1.1.
Site Requirements
For safe operation of the Gold Maestro make sure it is installed in an appropriate environment.
Feature
Value
Ambient operating temperature
0 °C to 40 °C (32 °F to 104 °F)
Maximum non-condensing humidity 90%
Operating area atmosphere
No flammable gases or vapors permitted in area
3.1.2.
Working Environment
Warning: During operation the Gold Maestro becomes hot to the touch (the
case can heat up to 50 °C). Care should be taken when handling it.
Caution: The Gold Maestro dissipates its heat by natural convection. The
maximum ambient operating temperature must not be exceeded.
3.2. Unpacking the Components
Before you begin working with the Gold Maestro system, verify that you have all of its
components, as follows:
•
The Gold Maestro multi-axis controller
•
Gold Maestro software which may be downloaded from www.elmomc.com
The Gold Maestro is shipped in a cardboard box with Styrofoam protection.
To unpack the Gold Maestro:
1.
Carefully remove the Gold Maestro from the box.
2.
Check the Gold Maestro to ensure that there is no visible damage to the instrument. If any
damage has occurred, report it immediately to the carrier that delivered your controller.
3.
To ensure that the Gold Maestro you have unpacked is the appropriate type for your
requirements, locate the part number sticker on the side of the Gold Maestro as shown
below.