Blade change optional 1/2" tool, Tool – BAND-IT UL4000-B Cordless Ultra-Lok Tool User Manual
Page 14
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-0307 USA
P: 1-800-525-0758
F: 1-800-624-3925
Document # P07986 Rev. F
© Copyright
BAND-IT-IDEX, Inc. 2011
All rights reserved
www.BAND-IT-IDEX.com
Page 14 of 14
UL4000-B
UL4000-B220
Ultra-Lok
Tool
Blade Change
Optional 1/2" Tool
To change out the tool to the 1/2" version, the following steps should be followed.
*NOTE: Do not attempt to use 1/2" clamps with 3/4" head. (Shear Plate change-out: 3-5 minutes)
1. Prior to separation from power drill, back off Tension Block assembly 1/2" from head unit. See page 7.
2. Detach Tension Body from the Drill by loosening the single tensioning bolt on the aluminum collar and separating the
two sections.
3. Remove the Blade from head by removing the two Cap Screws (M05787) from the top of the Head. It is not
necessary to remove entire head from tool in order to remove blade. (Figure 1) Remove the 3/4" shear plate from the
blade.
4. Align the 1/2" Shear Plate (M09387) with the Blade (M09787) so that the guide is facing up. Incorrect placement will
not allow bands to be inserted into the Tool. (Figure 1)
Note: To convert Tool back to 3/4", replace 1/2" Shear Plate with 3/4" Shear Plate (M09887) and follow same
instructions. Be sure to retain unused Shear Plate for later use.
5. Attach the Blade and 1/2" Shear Plate onto Head using the two previously removed Cap Screws. These Cap Screws
must be tight to assure proper cut-off of clamp tails.
6. Re-attach Drill to Tension Body making sure the Drill and Tension Body are properly aligned, and tighten the single
Blade Cap Screw located on the Adapter Collar.
7. These tools are not designed to work with traditional band and buckle designs. BAND-IT Ultra-Lok
clamps
must be used.
Figure 1
Figure 2
Optional 1/2" Shear
Plate (M09387)
Orient as shown
Blade (M09787)
Blade Cap Screw
(M05787) Qty. 2
1/4" Ball (M06587)
Bearing Tip (M05387)
Blade (M09787)