beautypg.com

Guide specifications j*04, Hvac guide specifications – Bryant LEGACY 558J User Manual

Page 47

background image

47

GUIDE SPECIFICATIONS -- 558J*04--07

Note about this specification:

Bryant wrote this specification in the 2004 version of the “Masterformat” as published by the Construction Specification

Institute. Please feel free to copy this specification directly into your building spec.

HVAC Guide Specifications

Size Range:

3 to 6 Nominal Tons

the environmentally sound refrigerant

This product has been designed and manufactured to

meet Energy Star® criteria for energy efficiency.

However, proper refrigerant charge and proper air flow

are critical to achieve rated capacity and efficiency.

Installation of this product should follow all

manufacturer’s refrigerant charging and air flow

instructions.

Failure to confirm proper charge and

air flow may reduce energy efficiency and shorten

equipment life.

Section

Description

23 06 80

Schedules for Decentralized HVAC Equipment

23 06 80.13

Decentralized Unitary HVAC Equipment Schedule

23 06 80.13.A. Rooftop unit schedule

1. Schedule is per the project specification requirements.

23 07 16

HVAC Equipment Insulation

23 07 16.13

Decentralized, Rooftop Units:

23 07 16.13.A. Evaporator fan compartment:

1. Interior cabinet surfaces shall be insulated with a minimum 1/2--in. thick, minimum 1 1/2 lb density, flexible

fiberglass insulation bonded with a phenolic binder, neoprene coated on the air side.

2. Insulation and adhesive shall meet NFPA 90A requirements for flame spread and smoke generation.

23 07 16.13.B. Electric heat compartment:

1. Aluminum foil--faced fiberglass insulation shall be used.
2. Insulation and adhesive shall meet NFPA 90A requirements for flame spread and smoke generation.

23 09 13

Instrumentation and Control Devices for HVAC

23 09 13.23

Sensors and Transmitters

23 09 13.23.A, Thermostats

1. Thermostat must

a. energize both “W” and “G” when calling for heat.

b. have capability to energize 2 different stages of cooling, and 2 different stages of heating.

c. must include capability for occupancy scheduling.

23 09 23

Direct--digital Control system for HVAC

23 09 23.13

Decentralized, Rooftop Units:

23 09 23.13.A. N/A
23 09 23.13.B. Open protocol, direct digital controller:

1. Shall be ASHRAE 62--2001 compliant.
2. Shall accept 18--30VAC, 50--60Hz, and consumer 15VA or less power.
3. Shall have an operating temperature range from --40_F (--40_C) to 130_F (54_C), 10% -- 90% RH (non--con-

densing).

4. Shall include built--in protocol for BACNET (MS/TP and PTP modes), Modbus (RTU and ASCII), Johnson

N2 and LonWorks. LonWorks Echelon processor required for all Lon applications shall be contained in separ-

ate communication board.

5. Shall allow access of up to 62 network variables (SNVT). Shall be compatible with all open controllers
6. Baud rate Controller shall be selectable using a dipswitch.

558J