8

OM-SN-E

5. Counter-Mounted Units

This section is applicable if the steamer will be mounted to a counter. All four

edges of the bottom of the steamer must be sealed with RTV to the counter if the

4 inch legs are not used. Counter must be made of a noncombustible material

such as metal or tile.

Ensure that there is a free air gap between the end of the unit drain and the

building drain. This gap should be as close as possible to the unit drain. Do not

allow elbows or restrictions between the unit and the free air gap.

Install the line with a constant downward pitch.

Installation

WARNING

DO NOT CONNECT THE UNIT DRAIN DIRECTLY

TO THE BUILDING DRAIN.

CAUTION

DO NOT USE PLASTIC PIPE. DRAIN MUST BE

RATED FOR BOILING WATER.

Rear view of double stack 5-pan assembly. Note: Some drain parts (elbow,

clamps) for single models are packed inside the steamer cavity. Stacked units

are factory assembled. Installation is the same for double stacked 5-pan and

3-pan units.

Proper drain line connection

Note: Drain line must have a constant

downward pitch of at least ¼” per foot.

Connection is 1½” for a 3-pan, 2” for 5-pan.

ELECTRICAL

CONNECTION

KNOCKOUTS FOR

1 INCH CONDUIT

ON 5-PAN; 3/4

INCH CONDUIT

ON 3-PAN