Installation – Blodgett SN-E Series User Manual
Page 10
![background image](/manuals/428372/10/background.png)
8
OM-SN-E
5. Counter-Mounted Units
This section is applicable if the steamer will be mounted to a counter. All four
edges of the bottom of the steamer must be sealed with RTV to the counter if the
4 inch legs are not used. Counter must be made of a noncombustible material
such as metal or tile.
Ensure that there is a free air gap between the end of the unit drain and the
building drain. This gap should be as close as possible to the unit drain. Do not
allow elbows or restrictions between the unit and the free air gap.
Install the line with a constant downward pitch.
Installation
WARNING
DO NOT CONNECT THE UNIT DRAIN DIRECTLY
TO THE BUILDING DRAIN.
CAUTION
DO NOT USE PLASTIC PIPE. DRAIN MUST BE
RATED FOR BOILING WATER.
Rear view of double stack 5-pan assembly. Note: Some drain parts (elbow,
clamps) for single models are packed inside the steamer cavity. Stacked units
are factory assembled. Installation is the same for double stacked 5-pan and
3-pan units.
Proper drain line connection
Note: Drain line must have a constant
downward pitch of at least ¼” per foot.
Connection is 1½” for a 3-pan, 2” for 5-pan.
ELECTRICAL
CONNECTION
KNOCKOUTS FOR
1 INCH CONDUIT
ON 5-PAN; 3/4
INCH CONDUIT
ON 3-PAN