Installation, Oven assembly to stand – Blodgett HV-50 User Manual
Page 8
6
Installation
Oven Assembly to Stand
OVEN LEVELING
1. Place a level on top of the oven. Loosen the set
screws on the side of each caster. Turn the adjust-
ment collar clockwise to raise and counter clockwise
to lower the oven.
2. When the oven is level, tighten the casters by turning
the two set screws on the side of each caster assem-
bly.
Figure 4
See also other documents in the category Blodgett Kiln:
- SG3240G (7 pages)
- MT3255G (2 pages)
- BCX-14G (60 pages)
- B36-RAD (24 pages)
- 1200 (3 pages)
- MT3240E/G (2 pages)
- SC-7G (20 pages)
- SN-5G (20 pages)
- 900 SERIES (22 pages)
- B48N-CCCC (2 pages)
- 1201 (2 pages)
- Conveyor Oven (3 pages)
- 966 (2 pages)
- COMBI B-142G (2 pages)
- AC-500 (15 pages)
- BE2136 (2 pages)
- BC-CCNE (2 pages)
- MT3870 (2 pages)
- KLT-12G (2 pages)
- KLT-12G (26 pages)
- ELECTRIC CONVEYOR OVEN MT1828E (2 pages)
- BG3240 (36 pages)
- R11021 (17 pages)
- RE-42 (2 pages)
- MT3855G (2 pages)
- COMBI COS-20G (2 pages)
- COS (2 pages)
- 1400 SERIES (18 pages)
- COMBI BC142EDS (2 pages)
- BG2136 (2 pages)
- 1415 (2 pages)
- 1415 (13 pages)
- ZEPHAIRE-E PLUS (2 pages)
- SHO-G (2 pages)
- S1820G (50 pages)
- MT2136E/G (2 pages)
- 1405 (2 pages)
- 1200 SERIES (16 pages)
- BCM (24 pages)
- BCT (47 pages)
- BC-20E (30 pages)
- BCP (52 pages)
- BDO-100-E (15 pages)
- DFG-100-ES (26 pages)
- Zephaire-100-G-Es (25 pages)