beautypg.com

Allied Telesis AT-x210-9GT User Manual

Page 55

background image

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

45

Figure 36. Switch Initialization Messages (Continued)

Assigning Active Workload to HA processes:

hsl, nsm, rmond, sflowd, vrrpd, irdpd, lacpd

lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd

Received event network.activated

Loading default configuration

Warning: flash:/default.cfg does not exist, loading factory defaults.

..

done!

Received event network.configured

awplus login:

This manual is related to the following products: