beautypg.com

Allied Telesis AT-x210-9GT User Manual

Page 52

background image

Chapter 2: Installation

42

Warning

Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.

E3

Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.

E5

4. Verify that the POWER LED is green. If the LED is OFF, see Chapter

3, “Troubleshooting” on page 47.

The switch is now powered on and ready for network operations. For
information on how to manage the switch, see the following manual:

„

AlliedWare Plus Software Reference for x210 Series Switches

This manual is related to the following products: