beautypg.com

Chapter 3 operation, Transport, Chapter 3 – Vaisala PTB330TS User Manual

Page 25: Figure 5, Transport case pressure release valve, Operation

background image

Chapter 3 ________________________________________________________________ Operation

VAISALA_______________________________________________________________________ 23

CHAPTER 3

OPERATION

This chapter contains information that is needed to operate the
PTB330TS.

Transport

Before transporting the PTB330TS, make sure that all instruments are
securely placed in the foam interior. The inside of the case should be
clean and dry. If water has entered the case due to operation in the field,
let it dry before closing.

The transport case has an air pressure release valve below the handle.
Close the valve for maximum protection during for transport, and open
it before attempting to open the case. The valve is closed when the
indicator in the valve is red, and open when it is green. Refer to

Figure

5 on page 23

. It may take some minutes for pressure to equalize after

opening the valve.

0801-001

Figure 5

Transport Case Pressure Release Valve