beautypg.com

Server operations, Powering up the server, Powering down the server – HP ProLiant DL380 G3 Server User Manual

Page 37

background image

37


Server Operations

In This Section

Powering Up the Server.......................................................................................................... 37
Powering Down the Server..................................................................................................... 37
Extending the Server from the Rack....................................................................................... 38
Removing the Access Panel ................................................................................................... 40
Installing the Access Panel ..................................................................................................... 40
Removing the PCI Riser Cage................................................................................................ 40
Installing the PCI Riser Cage ................................................................................................. 42

Powering Up the Server

To power up the server, press the Power On/Standby button.

Powering Down the Server

WARNING: To reduce the risk of personal injury, electric

shock, or damage to the equipment, remove the power cord to
remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the
power supply and some internal circuitry remain active until AC
power is removed.

IMPORTANT: If installing a hot-plug device, it is not necessary to
power down the server.

1. Back up the server data.

2. Shut down the operating system as directed by the operating system

documentation.

3. If the server is installed in a rack, press the UID LED button on the front

panel (1). Blue LEDs illuminate on the front and rear panels of the server.

HP CONFIDENTIAL

File Name: 303130-3.doc Last Saved On: 7/7/03 1:48 PM