Planning location, Figure 2-2, Power and signal cable routing – HP NonStop G-Series User Manual
Page 19
Unpacking the Tape Library
L700 (CTL700) Installation and User’s Guide — 527338-008
2 -3
Planning Location
Planning Location
•
Allow enough space for the tape library. Plan the signal cable and power cable
routing. Provide enough space to open all the doors.
•
Provide 15 centimeters (6 inches) above the tape library and 10 centimeters (4
inches) on the sides for cooling clearance.
•
See
for the space needed for the tape library.
•
See
for the locations for power and signal cable routing.
Follow the site guidelines detailed in the L700 Tape Library Installation Manual.
Figure 2-2. Power and Signal Cable Routing
Note. To ensure reliable operation, place the tape library in an environment that is free of dust
and excessive humidity.