Redundant hot-plug power supply option – HP ProLiant ML350 G4 Server User Manual
Page 65
Hardware Options Installation
65
7. Connect the SCSI and power cables.
8. Replace the front bezel ("Removing the Front Bezel (Tower Model)" on page
), if applicable.
9. Replace the access panel ("Removing Access Panel" on page
Refer to the HP Internal Two-Bay Hot-Plug SCSI Drive Cage Installation
Instructions for additional information.
Redundant Hot-Plug Power Supply Option
WARNING: To reduce the risk of personal injury or
damage to the equipment, the installation of power supplies
should be performed only by individuals who are qualified in
servicing server equipment and trained to deal with products
capable of producing hazardous energy levels.
WARNING: To reduce the risk of personal injury from hot
surfaces, observe the thermal labels on each power supply or
module.