HP ProLiant ML350 G4 Server User Manual
Page 38
38
HP ProLiant ML350 Generation 4p Server User Guide
NOTE: If using a round-hole rack, follow the same steps using the
round-hole cage nuts provided with the kit.
If you are installing the server into a telco rack, order the appropriate option kit at
the RackSolutions.com website (
). Follow the
server-specific instructions on the website to install the rack brackets. After
installing the brackets, follow the steps in this section.
WARNING: When installing a server in a telco rack, be
sure that the rack frame is adequately secured to the top and
bottom of the building structure.
1. Mark the rack with the rack template.
CAUTION: Always plan the rack installation so that the
heaviest item is on the bottom of the rack. Install the heaviest item first,
and continue to populate the rack from the bottom to the top.
NOTE: Rack components are removed for clarity.