beautypg.com

Optical drive option – HP ProLiant ML110 G7 Server User Manual

Page 42

background image

Hardware options installation 42

14.

Install the battery/capacitor pack.

15.

Install the full-length expansion board retainer, if any full-length expansion boards were removed.

16.

Install the air baffle (on page

22

).

17.

Install the access panel (on page

21

).

18.

Lock the tower bezel.

19.

Connect each power cord to the server.

20.

Connect each power cord to the power source.

21.

Power up the server (on page

19

).

Optical drive option

To install the component:

1.

Power down the server (on page

19

).

2.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

3.

Unlock the tower bezel ("

Unlock and open the tower bezel

" on page

20

).

4.

Remove the access panel (on page

21

).