beautypg.com

Powering up and configuring the server – HP ProLiant ML110 G7 Server User Manual

Page 28

background image

Setup 28

CAUTION:

To prevent damage to equipment, do not place the monitor on a rack-mounted

server. The rack enabling kit supports only the server.

5.

Slide the tray fully into the rack, and then tighten the thumbscrews.

6.

Slide the locking bracket forward, and then tighten the thumbscrews.

Powering up and configuring the server

To power up the server, press the Power On/Standby button.
While the server boots, RBSU and the ORCA utility are automatically configured to prepare the server for

operating system installation.
To configure these utilities manually:

Press the F8 key when prompted during the array controller initialization to configure the array
controller using ORCA.