beautypg.com

HP ProLiant ML110 G7 Server User Manual

Page 27

background image

Setup 27

CAUTION:

To avoid damage to the equipment, be sure that the rack rails are installed in a

predetermined location on the rack so that airflow clearance issues are resolved. For airflow

clearance information, refer to the documentation that ships with the server.

To install the component:

1.

See the "Installing the Product into a Rack" section of the 2U Quick Deploy Rack Rail System Installation
Instructions
to do the following:

a.

Install the component rails on the tray.

b.

Install the rack rails in the rack.

2.

Install the tray onto the rack rails, and then partially slide the assembly into the rack.

3.

Attach the straps to the tray.

4.

Place the server on the tray, and then secure the server to the tray.