Commissioning procedure
Humidification
Water Supply Feed
Indicate on the commissioning sheet how the water is fed to the unit.
·
Mains
·
Feed tank
·
Supply water pressure
Water System
Indicate what features are fitted to the installation.
·
Water strainer
·
Shut off valve
Bottle
Indicate on the commissioning sheet information regarding the humidifier bottle
·
Type
·
Size
·
Code
(e.g. BL0T3A00H0)
Measured
Measure the following information whilst the humidifier is operating.
·
Conductivity
·
Current L1,L2 and L3
1 Amp current approximates to about 1kg/hr of steam output.
Valve Operation
Ensure that the humidifier solenoid valve operates in the following states. Record on
commissioning sheet.
·
Fill
·
Drain
Drain Installation
Check that the humidifier drain is operating satisfactory and that there are no leaks.
Condenser
Check the fan operation on the condenser or dry cooler is correct. Record on the
commissioning sheet the following information.
·
Correct rotation
·
Motor current L1, L2 and L3 (AC Fans only)
·
Fan Speed
Water cooled condenser
Record on the commissioning sheet the following
·
Flow rate
·
Pressure drop