beautypg.com

Transducer wiring for bm90 / l – KROHNE BM 90 EN User Manual

Page 7

background image

7

Figure 2:

AC power supply - connected:

Earth

to terminal 1

Neutral

to terminal 2

Live to

terminal 3

The instrument will automatically accept either 110V or

230V AC –10%, 50Hz or 60Hz, 12VA. A time lag fuse

T160mA is fitted.

DC power supply - connected :

Positive +ve

to terminal 27

Negative -ve

to terminal 28

The instrument will accept 24V DC + 25%, - 10%. 9W.

A time lag fuse T315mA is fitted.

5 SPDT Relays - rated 8A/250V AC/30V DC resistive,

with gold contacts for lower power switching, are connect-

ed to terminals 4 to 18, for activating external alarms,

contactors, pumps etc..

Transducer RZV15 - is connected:

Black

to terminal 19

Blue

to terminal 20

Screen

to terminal 21

Temperature compensated transducer RZT15 -

is connected:

(Screen

to terminal 19

Must enable Pr.37

(Blue

to terminal 20

(Black

to terminal 22

Isolated Analogue - is connected :

Screen

to terminal 24

Positive +ve

to terminal 25

Negative -ve

to terminal 26.

Separate Temperature Compensation - when compen-

sation is provided by a separate temperature sensor, the

sensor should be connected with a shielded twisted pair

and connected:-

(Screen to

terminal 21

Must enable Pr.37

(Core*

to terminal 22

(Core*

to terminal 23

* The polarity of the cores is unimportant, but it is impor-

tant that the screen is connected only at the instrument

end and not at the temperature sensor end.

1 2 3

E N L

L2 L1

AC POWER

110/230 VAC

+10%/-10%
50/60 HZ

12VA

19 20 21 22 23 24 25 26

27 28

+ -

DC Power

21.6-30VDC

9W

Isolated

Analog

Output

+

-

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

RELAY 1

RELAY

3

RELAY

4

RELAY 5

RELAY 2

2.1.2. Transducer Wiring for BM90 / L

The wall mount instrument has two-part screw terminals. It can be powered from either an AC or DC supply.

Simultaneous AC & DC powering can be done through an external relay which switch on the other power when the

main one is off. The relay contact will be released when main power is off. Ask for scheme if necessary.