beautypg.com

Condec UPC5110 User Manual

Page 25

background image

22

UPC5100/UPC5110 Operation & Maintenance Manual

4. Remove end of nylon tubing that goes to the SUPPLY SELECT assembly, other end stays connected to

vacuum control assembly. Install customer supplied nylon tube, with fitting on other end, into SUPPLY
SELECT assembly. Install fitting end into test port of customer supplied Standard

5. Remove section of copper tubing that goes from

Chassis Mounted Regulator

to cylinder tee fitting. Tighten

plug fitting

(PN 69199)

where copper tubing section was on regulator.

6. Input customer supplied N

2

source to regulated pressure of 250 PSI

.

7. Turn

Chassis Mounted Regulator

shaft locknut counter-clockwise, to approximately 1/4" from top of shaft.

8. Use flat head screwdriver to rotate shaft, clockwise to increase, until Standard display reads 150-155 PSI.

9. Tighten shaft locknut, while holding screwdriver in position.

10. Shut off customer supplied N

2

source, and vent Standard.

11. Remove customer supplied nylon tube, with fitting on other end, from SUPPLY SELECT assembly and

test port of customer supplied Standard.

12. Replace end of nylon tubing that goes to the SUPPLY SELECT assembly, other end is connected to

vacuum control assembly

13. Remove plug fitting on regulator. Install section of copper tubing that goes from regulator assembly to

cylinder tee fitting.

14. Fill the cylinder to approximately 1000 PSIG and check all fittings for leaks. If there are no leaks, fill

nitrogen supply cylinder to maximum pressure. See Section 2.1 on page 4 for cylinder refilling
procedure.

15. Install panel/chassis assembly in its enclosure as described in Section 4.2.1 on page 14.

4.2.11

Pressure Limit Control (PN 58409) - Regulator Removal and Installation

Tools required:

7/16" open end wrench
hex wrench (.186")
channel locks
A/R 1/4" wide Teflon tape, (PN's 60575)

snoop, liquid leak gas detector (PN 64781)

Removal:

1. Vent any remaining nitrogen from cylinder to atmosphere. Disconnect power cord from power source.

2. Remove front panel from its enclosure as described in Section 4.2.1 on page 14, and carefully place on a

bench top.

3. Note the orientation and remove the tubing sections that connect to the regulator inlet and outlet fittings.

4. Loosen and remove regulator mounting nut from the front of panel, by using channel locks.

5. Note the orientation, then remove the regulator by sliding out from the panel rear.

6. Note the orientation of the inlet and outlet fittings in the regulator. Remove the fittings and any remnants

of Teflon tape from the pipe threads.

Installation:

1. Wrap two layers of Teflon tape on the pipe threads of each fitting and install into the inlet and outlet of

the regulator and ensure that each is oriented properly.

2. Insert the new regulator into the panel through rear of panel and rotate to proper position. Thread and

tighten the mounting nut onto the regulator body from the panel front.

3. Install the tubing sections to the inlet and outlet fittings.

4. Close PRESSURE LIMIT MONITOR by pulling regulator knob outward and turning counter-clockwise.

When closed, push knob inward.

5. Fill the cylinder to approximately 1000 PSIG and check all fittings for leaks. If there are no leaks, fill

nitrogen supply cylinder to maximum pressure. See Section 2.1 on page 4 for cylinder refilling
procedure.

6. Install panel/chassis assembly in its enclosure as described in Section 4.2.1 on page 14.

This manual is related to the following products: